Bottom up estimating [Technique]
A method of estimating a component of work. The work is decomposed into more detail. An estimate is prepared of what is needed to meet the requirements of each of the lower, more detailed pieces of work, and these estimated are then aggregated into a total quantity for the component of work. The accuracy of bottom up estimating is driven by the size and complexity of the work identified at the lower levels
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment